Lot D links the new Wendlingen–Ulm line via the Fildertunnel to the new Stuttgart underground railway station and connects Stuttgart Airport to the high-speed network underground.
On behalf of ARGE S21 Feste Fahrbahn Fildern, FCP provided the approval design, detailed structural design and as-built design of the ballast-less track and the underground cable works for Lot D of the Stuttgart 21 rail project. The high-speed section extends from the beginning of the new Wendlingen–Ulm line to the southern portal of the Fildertunnel (Lot C), through which the route passes into the new Stuttgart underground railway station.
The approx. 15 km long double-track section runs along the A8 motorway and is connected underground to Stuttgart Airport via the airport loop, which the Gäubahn line will join through the Pfaffensteigtunnel in the future. Lot D thus links the route from the main station with the new line to Ulm and the Gäubahn line.
The RHEDA 2000 track system was used throughout the entire lot, including 22 turnouts and 18 bridges. The station below the airport grounds was equipped with a floating track slab to protect the structures above against vibrations and secondary noise caused by railway operations.