Operating Licence
Professional. Forward-looking. Efficient.
The operating licence is complex – we make it simple. With FCP you get an experienced team, which combines technical, legal and ecological know-how in a sophisticated total package. Both for new design and extension – we support you with tailor-made solutions up to the successful approval of your facilities.
Air
Emission Analyses and Dispersion Simulations
Dust, smell, harmful substances
- With well-founded emission analyses and dispersion simulations we can identify potential conflicts in neighbourhood protection early and develop specific solution strategies.
Light
Analysis of Daylight and Artificial Light, Dazzling and Shadowing
- Ray-tracing simulations for sufficient working place and outdoor lighting of your facilities.
- Observance of standards and guidelines relevant for working places.
Noise
Sound Measurements, Forecasts and Noise Protection Concepts
- Protection of the environment.
- Proof of approval.
Vibration Engineering
Vibration Surveys for the Assessment of Vibrations in Operation and by Operational Influences
- Assessment of machine, facility and traffic vibrations.
- Relevance for neighbour and employee protection.
Fire Protection
Representation of all Necessary Measures for Fire Protection and Fighting
- Fire protection concepts for structural, technical and organizational measures.
- Tailor-made solutions for risk minimization.
- Documentation as required by the authorities.
Sewage Water & Waste
Design of Drainage and Waste Management
- Proof of legally compliant, environmentally sound disposal of in-plant wastes.
- Coordination with infrastructure and operational concept.
- Discharge of rain and wastewater.
Traffic
Traffic Assessments
- Analysis of Traffic volume, safety and development.
- Support in logistic concepts and coordination with public authorities.
Step by Step to the Operating Licence
1. CONSULTATION
Initial analysis of the requirements and project targets considering the legal framework like trade law and environmental protection law.
2. ANALYSES
Survey of the current status, measurements as well as environmental and risk assessments to be able to define the impacts of the planned facility.
3. EMISSION SURVEYS
Preparation of emission surveys and development of measures for emission mitigation – as a basis for the submission of documents.
4. COORDINATION WITH AUTHORITIES
Early communication with the competent authorities to clarify open questions and avoid delays.
5. APPLICATION
Official application and implementation of the licensing procedure incl. potential visual inspections on site or negotiations.
6. APPROVAL
After check and any required further adaptations, the licensing notice is issued which includes all the relevant terms and conditions for the operation of the facility.
7. INITIAL OPERATION
After successful implementation the facility is put into operation considering all the official requirements. The authority can also demand regular checks after the start of operation to ensure that all licensing conditions are still met.
„ An operating license does not have to be an obstacle. We pave the way – professionally, forward-looking and efficiently. “
Authorized representative of FCP
Operating licences are complex.
We make them simple!
Your Benefit with FCP
- Interdisciplinary expertise from environmental engineering, construction, traffic and law
- Long-standing experience in various fields
- Efficient communication with authorities and stakeholders
- Individual project support – specific, solution-oriented, efficient
You plan a new facility or an extension?
Please contact us – we are looking forward to supporting you.